TOWN OF
PLANNING BOARD
January 10, 2011
PRESENT: Chairman Doug Allen, members Suzanne Airy, Mark McEwen, Tom Morrison, Kevin Rooney and Greg Whitney. Also present were Town Councilman David McEwen (via video conference), Town Engineer Scott Allen and Board Clerk Susan Bush. Absent was Mert Bartels.
Chairman Allen called the meeting to order at 7:30 p.m.
NEW BUSINESS:
PB-01-11 – Beckenbach – 1116 Route 31
– Commercial site plan – Log-in & sketch – Applicant James Beckenbach and Engineer Don Lewis of AEY Enterprises were
present to explain this application. The
subject parcel is 3.04 acres and is zoned General Commercial. Mr. Beckenbach has
a purchase offer on the property subject to site plan approval. He is proposing two additions to the existing
building to accommodate the relocation and expansion of his business, Infinite
Audio. The addition to the west would
contain offices and showroom space, and the addition at the back would house
the service/installation operation.
There is an existing sewer lateral off the rear of the building. Minimal site grading will be done, and a
SWPPP will not be required. Variances
have been received from the ZBA for front setback and expansion of a
non-conforming building (application Z-06-10).
Retail space in the current building will be renovated and leased to a
tenant, and an existing apartment will be maintained as a residence. The building also has two overhead doors
which will be used as access to the new service area. Applicant would like to renovate the existing
building first, bringing in a tenant, and then begin construction of the
expansion space. There will be dedicated
parking (slant) along the front with an additional stone parking area in the
rear. Board discussed number of parking
spaces needed (tenant, residence, expanded business) and asked that an
additional area be defined for future use if warranted. Board
requested the front parking area be paved with pavement extending to the back
line of the building. Rear parking areas
could be left as stone. A rough front
elevation of the building was presented.
Applicant is in the process of hiring an architect and will have more
detailed renderings, including landscaping, at the next meeting. A motion to grant sketch plan approval was made
by
TOWN BOARD REFERRAL:
RZ-01-10 – AEY/P & B Development –
MINUTES:
A motion to approve the 12-13-10 minutes was made by Suzanne Airy, seconded by Mark McEwen. All in favor; minutes approved.
ADJOURNMENT:
A motion to adjourn was made by Suzanne Airy, seconded by Mark McEwen. All in favor; meeting adjourned at 8:38 p.m.
Respectfully submitted,
Susan Bush
Clerk to the Board