PLANNING BOARD
April 24, 2006
PRESENT: Chairman Doug Allen, members Suzanne Airy, Mark McEwen, Tom Morrison and Kevin Rooney. Also present were Councilman Ken Nawrocki, Town Engineer Scott Allen and Board Clerk Susan Bush. Absent were Mert Bartels and Brian Gagne.
Chairman Allen called the meeting to order at 7:30 p.m.
NEW BUSINESS:
PB-05-06 Newcomb Oil Co. 1116 Route 31 Fill Rick Brown from Newcomb Oil explained their request to place approximately 40,000 yds. of fill behind their station, bringing the area up to grade. Work will be done in two phases of .9 acres each. An 18 drainage pipe will be installed, terminating at an existing swale. Station will be connected to sewer, and the septic system will be abandoned, crushed & filled. Newcomb would like to begin clearing the site as soon as possible with fill arriving from highway reconstruction projects when available. Work will start at the building & move outward, finishing as they go. Additional items discussed were: Previously proposed front berm; maintenance of open area & along Route 31; stabilization of construction entrance (crushed stone) & DOT permit requirement; storm water management permit (responsibility of applicant); drainage detention (rip rap at pipe entrance/exit); revised plan showing temporary detention area during fill period; Town Engineers 02-22-06 letter. Applicant will return at the May 8th meeting with revised plans.
TOWN BOARD REFERRAL:
Beckenbach/Empire Auto Salvage
OLD BUSINESS;
PB-11-05 DeHollander
PB-02-06 Gananda Partnership
LOG-INS:
PB-04-06 Gananda Partnership
PB-03-06 Macedon Land Associates, LLC Route 31/Macedon Parkway Realty subdivision & commercial site plans Shoppes at Macedon (Lowes) Present were Ron Bronstein of Paradigm Development, Dave Kane of T-K Engineering & Design, and Taylor McDermott of Lowes Site Development. This development consists of three lots: (1) 16.64 acres with a 171,000 sq. ft. Lowes Home Improvement store; (2) 2.53 acres with retail shops (5 store fronts); and, (3) 2.64 acres with a restaurant. Surveying, traffic and archeological studies are currently underway. A traffic signal is planned for Route 31 & Macedon Parkway. ZBA application has been submitted for the number of parking spaces for Lowes and the retail shops, number and size of various signs, and height of the Lowes building. Mr. McDermott gave a brief overview of the Lowes operation. The store will be similar to the Webster location, employing approximately 175 people (75% full time) with an annual payroll of $5-6 million. Hours of operation will be 6:00 a.m.-10:00 p.m. Monday to Saturday and 7:00 a.m.-8:00 p.m. on Sunday. The building will be set back 413+ ft. from Route 31 with road access and maintenance shared among the three parcel owners. Storm water will be directed north to an existing pond. Site lighting will be on 35 ft. poles (37 ft. including base). Other items discussed were: Building faηade upgrade from standard, colored vs. painted split-face block; parking; garden center fencing; pilasters on western elevation; landscaping plan; sample board of materials to be used. Sketch plan review is scheduled for May 8th.
Motion made by Kevin Rooney, seconded by Mark McEwen, for a resolution to declare the Macedon Town Planning Board as lead agent for environmental review for this project. All in favor; motion carried. THEREFORE, be it resolved the Macedon Town Planning Board has declared it shall be the lead agency for all environmental review of the proposed action for the Shoppes at Macedon Development Project.
ZBA REFERRALS:
Z-02-06 Macedon Land Associates, LLC Area Variance Sections 135-159 Schedule I, 135-83 Schedule III, 135-191 Commercial building height, number of parking spaces, number & size of signs (1) Commercial building height Motion made by Kevin Rooney, seconded by Tom Morrison, for a positive referral. All in favor; motion carried. (2) Parking spaces Parcel #2 retail shops Motion made by Tom Morrison, seconded by Kevin Rooney, for a positive referral. All in favor; motion carried. (3) Signs ZBA application will be amended to include a second pylon sign at the proposed Wayneport Road/East Park entrance. Motion made by Mark McEwen, seconded by Suzanne Airy, for a positive referral (including second pylon). All in favor; motion carried.
Z-03-06
Littlefield (Altom, LLC) 1140 Route 31
Area Variance Section 135 Schedule I Front setback Applicant Tom
Littlefield explained his proposal for three (3) self-storage buildings. Due to the location (beyond the west end of
MINUTES:
Motion made by Mark McEwen, seconded by Suzanne Airy, to approve the 04-10-06 minutes. All in favor; minutes approved.
ADJOURNMENT:
Motion to adjourn made by Kevin Rooney, seconded by Tom Morrison. All in favor; meeting adjourned at 9:58 p.m.
Respectfully submitted,
Susan Bush
Clerk to the Board